
RUWAIS – DIYAB GAS DEVELOPMENT PROJECT
Project Description
Client: AL MANSOORI PRODUCTION SERVICES /ADNOC
Location: RUWAIS
Year: 2024 – 2025 (10 Months) Completed
Scope:
- Engineering, procurement, and construction of:
- Well pads.
- Flowlines.
- Pilot production facility.
- Gas export pipelines.
- Instrumentation, control systems, and produced water treatment. Installation of necessary equipment, such as separators, compressors, amine unit, TEG unit, fuel gas system and fiscal metering, along with pipeline construction, E&I Works, CP Works and implementation of leak detection systems.