RUWAIS – DIYAB GAS DEVELOPMENT PROJECT

Home/RUWAIS – DIYAB GAS DEVELOPMENT PROJECT
RUWAIS – DIYAB GAS DEVELOPMENT PROJECT
Project Description

Client: AL MANSOORI PRODUCTION SERVICES /ADNOC
Location: RUWAIS
Year: 2024 – 2025 (10 Months) Completed

Scope:

  • Engineering, procurement, and construction of:
    • Well pads.
    • Flowlines.
    • Pilot production facility.
    • Gas export pipelines.
  • Instrumentation, control systems, and produced water treatment. Installation of necessary equipment, such as separators, compressors, amine unit, TEG unit, fuel gas system and fiscal metering, along with pipeline construction, E&I Works, CP Works and implementation of leak detection systems.