UNCONVENTIONAL OIL FIELD (BLOCK – 2) PILOT PROJECT – UC-02 HUP-02 EARLY PRODUCTION FACILITY

Home/UNCONVENTIONAL OIL FIELD (BLOCK – 2) PILOT PROJECT – UC-02 HUP-02 EARLY PRODUCTION FACILITY
UNCONVENTIONAL OIL FIELD (BLOCK – 2) PILOT PROJECT – UC-02 HUP-02 EARLY PRODUCTION FACILITY
Project Description

Client: ADNOC
Location: Huwaila
Year: 2025 – 2026 (19 Months) DBOOM – Ongoing

Scope:

  • Pre-Construction Activities Includes surveys, NOCs for Pipeline routes, and site preparation.
  • Design, detailed engineering, procurement, supply, expediting, logistics, and transportation.
  • Fabrication, construction, installation, testing, and achieving mechanical completion.
  • RTP Pipeline Construction.
  • Pre-commissioning, commissioning, start-up, site performance testing, operation, and maintenance.