
UNCONVENTIONAL OIL FIELD (BLOCK – 2) PILOT PROJECT – UC-02 HUP-02 EARLY PRODUCTION FACILITY
Project Description
Client: ADNOC
Location: Huwaila
Year: 2025 – 2026 (19 Months) DBOOM – Ongoing
Scope:
- Pre-Construction Activities Includes surveys, NOCs for Pipeline routes, and site preparation.
- Design, detailed engineering, procurement, supply, expediting, logistics, and transportation.
- Fabrication, construction, installation, testing, and achieving mechanical completion.
- RTP Pipeline Construction.
- Pre-commissioning, commissioning, start-up, site performance testing, operation, and maintenance.